Skip to content

Electricity, Water, and Natural Gas Transfer Procedures: A Step-by-Step Guide to Moving to Ankara

Why are electricity, water, and natural gas connections important during a move?

If you're moving house in Ankara, you're probably busy for days packing boxes and disassembling and reassembling furniture. However, there's a crucial point that's often overlooked: electricity, water and natural gas transmission operationsFailing to seamlessly transfer this plumbing system to your new home will not only result in financial loss, but also create problems meeting your basic needs in your current living space.

Power outages, water shortages, or gas problems can seriously affect your home life immediately after moving. That's why... Things to do a week before moving These relocation procedures should be among the top priorities. If you live in districts of Ankara such as Çankaya, Yenimahalle, Keçiören, or Etimesgut, don't neglect these steps.

Electricity Transmission Procedures: Step-by-Step Guide

Electricity transfer procedures are a process that must begin at your current address and end at your new address.

1. Electricity Transfer Application to Your Old Address

Notify the Electricity Distribution CompanyApply to the relevant electricity distribution company in Ankara (usually Ankara Elektrik in Ankara) by phone or in person at least 1-2 weeks before your move. Inform them of the date you moved from your old address, your new address, and your contact information.

Closing a Postpaid AccountRequest a meter reader to receive the final bill. If there is any remaining balance to be saved, the refund process will be initiated. Keep this document complete to avoid any financial issues regarding the final meter reading from your old address.

2. Requests for Electricity Connection at Your New Address

After moving into your new home, immediately go to your local electricity distribution company and request an electricity connection. Required documents:

  • Photocopy of ID
  • New address document (deed, rental agreement, residence certificate)
  • Property tax certificate
  • Apartment/street number and line information

The electricity infrastructure may vary in rapidly growing neighborhoods of Ankara (Eryaman, Gölbaşı, and the area around the İvedik Organized Industrial Zone). Consulting your local branch is the smartest option to avoid delays.

Water Transportation Operations: For Uninterrupted Water Supply

Although water transportation processes don't take as long as electricity transportation, they still need to be planned and started in advance.

Terminating the Water Connection at Your Old Address

Inform the Ankara Water and Sewerage Administration (ASKİ) or your local water works directorate at least one week before your move. Schedule an appointment for the last meter reading and account closing procedures. If there are any outstanding debts, settle them before moving.

New House Water Connection

If your new address is a previously occupied home, Check the condition of the existing plumbing.If you are opening it for the first time, follow these steps:

  • Apply for a connection to your local water works department.
  • Present your property deed or residence certificate and other required documents.
  • The piping is measured; a meter is installed.
  • It is advisable to perform a pressure test on the system before use.

Natural Gas Transportation Procedures: Safe and Official Procedures

Natural gas transmission procedures are subject to more rigorous and official regulations compared to other installations. Don't take this lightly.

Cancel your natural gas request at your old address.

Inform the gas company providing service in Ankara (usually Ankara Doğalgaz) of the date of relocation. Have them complete the final accounting transactions for which payment has been made. Obtain a document showing the last meter reading from the old meter.

Natural Gas Connection to the New House

Absolutely have this work done by a qualified and licensed plumber. A faulty natural gas installation can cause serious damage and even the destruction of all belongings. Steps:

  • Apply to the natural gas distribution company.
  • Assign a qualified electrician/plumber to measure the wiring.
  • Meter installation and pressure testing (gas leak check) are performed.
  • The service is initiated upon signing the technical report.
  • Each user should check the devices in the first few days after moving in and report any abnormalities, such as odors, immediately.

Which Documents Should Be Kept?

Keeping records of all utility bill (electricity, water, natural gas) transactions provides protection against potential problems in the coming months.

  • Last bills from the old address
  • New address connection confirmation documents
  • Techn Reports (specifically on natural gas installations)
  • Meter reading records
  • Receipts and payment documents

How to organize these tasks in your moving plan?

Exp Click to Move While professional moving companies handle the technical aspects of the move (furniture disassembly and assembly, packing, elevator transport), the transfer of electricity, water, and natural gas is the client's responsibility. However, a good moving plan guarantees that these processes are completed on time.

  • Two weeks before moving: Inform the electricity, water, and gas companies at the old address.
  • One week before moving: Initiate connection requests related to the new address.
  • Moving day: If your old address is problem-free, arrange for the moving team to arrive.
  • Moving day evening: Check that electricity, water, and natural gas are available at your new address.

These procedures may vary in different districts of Ankara (from Çankaya to Eryaman, from Keçiören to Etimesgut). Each neighborhood may have different electricity distribution, water, and natural gas infrastructure.

What numbers should you call in an emergency?

If you experience problems with electricity, water, or natural gas after moving in, quickly:

  • Electrical Emergencies: Ankara Electricity customer service
  • Water Problem: ASKI Night Line and Emergency Service
  • Natural Gas Leak (Emergency): Natural gas company's 24-hour emergency hotline and fire department.

Write these numbers down and save them on your phone.

Post-Move Cleaning and Finishing Services

Once the electricity, water, and natural gas connections are completed, your new home should be ready for occupancy. Exp Click to MoveBy offering post-move cleaning, disinfection, and even painting and renovation services, we get your new home completely ready. From the initial architectural assessment to professional packing and item tracking with a numbered box system, we're with you every step of the way during your move.

For your transactions in Ankara You can reach our address from this location. Or you can ask your questions through our social media channels. From our Instagram page You can browse our successful moving projects.

Conclusion: A Planned Move, A Stress-Free Start.

While electricity, water, and natural gas connection processes may not seem as difficult as the entire move, they are processes that require prior planning and adherence to official procedures. Saving a week means months of problems later. Whether you are moving to any district of Ankara (Çankaya, Yenimahalle, Etimesgut, Gölbaşı, Keçiören, Eryaman), write these steps down on a schedule and complete them in order.

If you need professional help with moving and cleaning, Exp Click to Move Our team is always ready. You can get a quick quote via WhatsApp or phone, and request a free survey. It's time to make your move in Ankara safe, planned, and stress-free.

What We Have Prepared For You